View Single Post
Old 06-23-2020, 05:55 PM   #85
Oddball Matt   Oddball Matt is offline
 
Join Date: Jan 2020
Location: Vääksy, Finland
Posts: 401


Getting to the "pleasant problem" point of this build; not a whole lot left to do before the final parts shipment arrives... Fitted and adjusted the fairings, fixed the non working high beam (bent contact prong behind the bulb, was armed to the teeth prepared of an all-nighter, took about two minutes) tried to drill out a snapped bolt, didn`t budged so ended up drilling through and retapping, fitted left side ankle guard, drank a few beers, tucked in some wires, fitted new rear reflectors, adjusted headlight down....



Bit on the fence whether to black out that bullet box or leave it as is (sticks out as the only army colored thing...)

Still to do:

-Front engine mount missing one bolt
-Exhaust joint missing clamp (41-42mm as a reminder for myself)
-Rear brake disc & pads swap when the package comes
-Brake bleed/fluid swap
-Swap out the balljoint on the unpainted front arm
-Swap out remaining front balljoint rubbers and grease joints.
-wheel alignment
-Paint that final front arm and rear hubs
-Finish and paint fog light/indicator brackets
-Bend chain roller arm back to alignment
-Wash&wax
-Pump up tires
-MOT
__________________
2004 Longjia Grido 50 scooter
1999 Cagiva Mito 125 Evo, Yamaha XV125 engine, Ducati SS fairings, getting turboed
1993 Yamaha GTS 1000
Ex:Bashan BS200-S7 `07 Streetfighter-quad


 
Reply With Quote