View Single Post
Old 11-20-2015, 05:09 AM   #3
SpudRider   SpudRider is offline
 
SpudRider's Avatar
 
Join Date: Jul 2008
Location: Idaho
Posts: 25,054
Installing the Cylinder Head

Replace the two dowel pins (A).
Install a new cylinder head gasket.
Install the cam chain guide (B).



Install the cylinder head.

Tighten the 4 nuts (B), incrementally, in a crisscross pattern. Final torque for each nut is 28 foot-pounds (50 Nm).



Install the bolt (A), which retains the clip supporting the hose leading from the contaminant separator to the air box. This bolt should be tightened to a torque of 9 foot-pounds (12 Nm).

Check, and make sure the crankshaft is positioned at the TDC mark on the flywheel.
If necessary, hold the cam chain and rotate the crankshaft to the proper position.
__________________
Spud

"Never argue with an idiot. He will drag you down to his level, and beat you with experience." Mark Twain

2015 Zongshen ZS250GY-3 (RX3)
2006 Zongshen ZS200GY-2 (Sierra 200)
2005 Honda XR650L
2004 Honda CRF250X
1998 Kawasaki KDX220

Mods made to my Zongshen ZS200GY-2: http://www.chinariders.net/showthread.php?t=6894



Last edited by SpudRider; 12-13-2016 at 02:28 PM.
 
Reply With Quote