Go Back   ChinaRiders Forums > Technical/Performance > Everything Else
Register FAQ Community Calendar Today's Posts Search
 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 05-18-2020, 10:02 AM   #1
Sport Rider   Sport Rider is offline
 
Sport Rider's Avatar
 
Join Date: Jan 2016
Location: Mooresville NC
Posts: 2,038
New Project

Yes...it's another C10. This time I picked up a 2002 C10 with 76000 miles on the clock. Problem? hydrolocked motor. I'm going to try my hand at rebuilding the motor since I've never torn one down that far. Pic below is the starting point. all the front and lower plastics are off.

The bike has been pretty well taken care of, but the owner (since it was new) dropped it a couple times. no wrecks. just parking lot drops. The problem though is that several of the tabs for mounting the lowers are broken off. I haven't decided yet if I'll put it back together without the lowers or convert all the bodywork to my spare Beige Betty parts. we'll see. first step is the motor. if that doesn't run, the rest is a moot point, right?

I have another motor with 140k miles. it's a known runner. I might get away with just having to replace the rods as that's typically the part that fails. Once I tear it down, I'll know for sure.

wish me luck!
Attached Images
File Type: jpg 20200517_093214.jpg (101.4 KB, 437 views)


 
Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 07:22 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.