![]() |
#1 |
Join Date: Dec 2015
Posts: 200
|
Garage pro box
To all that have installed the garage pro rear box. How many bolts did you use? Did you use 2 existing holes and drill 2 more?
__________________
2016 CSC RX3 Ginger Edition Check out my blog here: https://www.facebook.com/My-CSC-Zong...0302595973417/ |
![]() |
![]() |
#2 |
Join Date: Jan 2015
Location: Northern Virginia
Posts: 144
|
I drilled three holes to line up with the threaded holes in the RX3 carrier. The two forward holes in the GP plate are just outside and to the front of the two forward slots, The center of the rear hole is 21mm forward of the front edge of the latch doohicky. The plate fit perfectly over the RX3 carrier. I put a number of wide plastic washers I had between the GP plate and the RX3 carrier to lift the plate up a bit so the slot edges would be squished. And I put some marine adhesive under the four rubber bumper on the GP plate so they would not fall off.
|
![]() |
![]() |
#3 |
Join Date: Jul 2008
Location: Idaho
Posts: 25,054
|
Initially I did the same as NoVa Rider, but I did not use the plastic washers, which are an excellent idea.
![]() I had a spare mounting plate, so I installed the new plate in a different location. I found a perfectly flat mounting position on the RX3 rack, and drilled four new holes. The mounting plate is now rock solid, and I haven't had any problems since. ![]()
__________________
Spud "Never argue with an idiot. He will drag you down to his level, and beat you with experience." ![]() 2015 Zongshen ZS250GY-3 (RX3) 2006 Zongshen ZS200GY-2 (Sierra 200) 2005 Honda XR650L 2004 Honda CRF250X 1998 Kawasaki KDX220 Mods made to my Zongshen ZS200GY-2: http://www.chinariders.net/showthread.php?t=6894 |
![]() |
|
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|